Page 48 - ANALYSIS.XLS
P. 48

Continually remove weed/tree growth
            6.3.3                        Public Works  Ongoing  Program  Program  Program  To maintain water flow/ reduce flooding.
                and garbage in open drainage facilities
                Reprofile main drain ditches   Public Works;
            6.3.4                                  Ongoing  Program  Program   Program  To increase water flow/ reduce flooding.
                (wider/deeper)            Engineering
                                                                                      Improve access to existing drainage
                Drainage Channel Maintenance
            6.3.5                        Public Works  Ongoing  Program  Program  Program  channels to facilitate maintenance activities
                Access Improvements
                                                                                      necessary for proper channel function.
                                                                                      Inspect and flush existing storm water
            6.3.6 Storm System Inspection and Flushing  Public Works  Ongoing  Program  Program  Program  infrastructure to ensure proper function and
                                                                                      ultimately reduce likelihood of flooding.
                                                                                      Assess and mitigate bank and storm sewer
                                         Public Works;
            6.3.7 Drainage Channel Erosion Mitigation  Ongoing  Program  Program  Program  outfall erosion to maintain integrity and
                                          Engineering
                                                                                      function of drainage channel.
                                                                                      Establish baseline stormwater quality (WQ)
                                                                                      parameters to monitor watershed health and
                                         Public Works;
            6.3.8 Stormwater Quality Monitoring    Ongoing  Program  Program   Program  develop/implement necessary best
                                          Engineering
                                                                                      management practices (BMPs) to reduce
                                                                                      potential pollutants.
                                                                                      Small/medium scale repair of existing,
                Storm sewer Infrastructure                                            deteriorated storm sewer infrastructure and
            6.3.9                        Public Works  Ongoing  Program  Program  Program
                Maintenance/Installation                                              small/medium scale in-house storm sewer
                                                                                      infrastructure construction projects.
                                                                                      Operate and maintain stormwater pump
                Stormwater Pump Station and Gate                                      stations and gated control structures to
           6.3.10 Structure Outfall Operation &   Public Works  Ongoing  Program  Program  Program  reduce likelihood  of flooding from moderate
                Maintenance
                                                                                      to severe storm events.
                                                                                      Educate the public about stormwater
                Stormwater Public Education &                                         infrastructure and runoff quality to
           6.3.11                        Public Works  Ongoing  Program  Program  Program
                Outreach                                                              cooperatively ensure storm sewers are kept
                                                                                      free of debris and potential pollutants.
                Adopt Stormwater Management   Public Works;                           Held Workshop with City Commission,
           6.3.12                                  Ongoing  Program  Program   Program
                Ordinance; Implement      Engineering                                 reviewing with Legal for ordinance format.
                                      Strategy 6.4:  Provide high quality water and sewer services.
                                                                                      Increase Capacity at the South Water
                                                     18
            6.4.1 SWTP Expansion Filter/Clarifier  MPU    $10,000,000  $6,100,000  $3,900,000 Treatment Plant and upgrade the SCADA
                                                   months
                                                                                      system.
                                                                                      Installation of Back-up Power Generators
                North WWTP Electrical & SCADA
            6.4.2                           MPU     1 year  $2,414,550  $1,489,957  $924,593  necessary to maintain the Plant's Process
                Programming
                                                                                      Operational during events of Power Loss.
                                                                                      Multi-phase of a sanitary sewer masterplan
                                                    Multi-
            6.4.3 Sprague Sanitary Sewer    MPU            $6,700,000  $3,500,000  $3,200,000 to provide sanitary sewer to the north
                                                    year
                                                                                      western sewer CCN area.
                                                                                      Construction of new Administration and
                South WWTP Administration &                                           Operations Building, which is necessary for
            6.4.4                           MPU    8 months  $2,300,000  $325,000 $1,975,000
                Operations Building                                                   day to day operations of the SWWTP
                                                                                      Facility.
                AMI Project - Major project to replace   Multi-                       Subject to securing funding, this is an
            6.4.5                           MPU           $16,500,000  $0      Program
                Meters                              year                              important +
                New Reservoir Embankment                                              Improvements to help stabilize levee for
            6.4.6                           MPU    6 months  $1,000,000  $0   $1,000,000
                Reinforcement                                                         both North and South Reservoirs
                                                                                      Installation of a wastewater system to
                                                     18
            6.4.7 Dicker Road Sewer project (Phase I)  MPU  $2,000,000  $1,200,000  $800,000  provide services to the Southern sewer CCN
                                                   months
                                                                                      area.
                Southeast Waterline Improve (Dicker   Multi-
            6.4.8                           MPU            $770,580  $750,000   $0    Project Finalizing Completions
                10th-McColl)                        year
                South-east Water Transmission Line   18
            6.4.9                           MPU            $700,000  $700,000   $0    Project Finalizing Completions
                (Dicker Road, 23rd to 10th)        months
                                                                                      New transmission line to help deliver
                                                     18
           6.4.10 SWTP Transmission Main to Ware Rd  MPU   $800,000    $0     $800,000  potable water to the western half of McAllen
                                                   months
                                                                                      service area.
                                                     18                               Raw water line to deliver a new source
           6.4.11 HCID #1 Raw Waterline     MPU            $800,000    $0     $800,000
                                                   months                             water to our South Water Treatment Plant.
                                                                                      A study will be conducted to evaluate
           6.4.12 SWTP Electrical Generator Project  MPU  6 months  $100,000  $50,000  $100,000  options for increasing Generator Capacity at
                                                                                      South Water Treatment Plant
                                                            -xxxvi-