City of McAllen, Texas                                                           Adopted Budget 2023


            Improve City Traffic flow

              •  Bicentennial Boulevard Extension
               Management’s Response: Bicentennial’s expansion to the north, from the airport to 107� This project consists
               of the extension of a 4-lane urban curb and gutter paved roadway from Trenton Road to State Highway 107
               (University Drive)� The extension of Bicentennial Boulevard is 2�80 miles and includes a storm water management
               system, potable water, and sanitary sewer infrastructure, installation of two raw water underground mains for
               irrigation, sidewalks, and noise attenuation barriers along the right of way at existing residential subdivisions�
               This adds another major arterial roadway to the City� Project completed December 2021�
              •  Dove Avenue Widening
               Management’s Response: Dove Avenue between Bicentennial and 23rd Street-This project added capacity to
               the roadway by widening Dove Avenue to construct a center turn lane between Bicentennial and 23rd Street�
               Project completed February 2022�
              •  Traffic Signal Study
               Management’s Response: Various locations around City of McAllen-The project consists of a Comprehensive
               Traffic Study for signal timing coordination of 155 signals along major north/south and east/west corridors.
               Collection of data for signal timings began in Fall 2021 with implementation city wide May 2022� Project
               implemented May 2022 but will continually monitor for effectiveness�

            Improve City Storm Drainage
              •  Dove Avenue Drainage Improvements
               Management’s Response: Intersection of North 10th Street and Dove Avenue, as well as reducing the strain on
               existing storm sewer systems between North 2nd and North 6th Streets-This project consists of storm sewer
               infrastructure improvements to address an area with a limited and undersized existing storm sewer system that
               is prone to localized shallow flooding, especially during moderate to severe storm events. Project completed
               January 2022�
              •  Northwest Blueline Hibiscus Tributary Drainage Improvements
               Management’s Response:�Northwest Blueline Hibiscus Tributary West of North 23rd Street-This project consists
               of channel regrading and reprofiling to improve stormwater storage and conveyance capacity. Project completed
               January 2022�
              •  North 8th Camelia Avenue Drainage Improvements
               Management’s Response: North 8th Street between Harvey and Camellia Avenue-This project consists of
               improvements to storm sewer infrastructure to address area with a limited and undersized existing storm sewer
               system that is prone to localized shallow flooding, especially during moderate to severe storm events. Project
               completed March 2022�

              •  Gardenia Avenue at 12th Street Drainage Improvements
               Management’s Response: Gardenia Avenue between North 12th Street and Bicentennial Blueline-This project
               consists of improvements to storm sewer infrastructure to address area with a limited and undersized existing
               storm sewer system that is prone to localized shallow flooding, especially during moderate to severe storm
               events� Project completed March 2022�
              •  Vine Avenue at North 48th Street Bypass Drainage Improvements
               Management’s Response: North 48th Street at Vine Avenue-This project consists of storm sewer infrastructure
               improvements to address an area with a limited and undersized existing storm sewer system that is prone to
               localized shallow flooding, especially during moderate to severe storm events. Project completed September
               2022�

            Leisure, Cultural and Entertainment

              •  Crockett Skate Park
               Management’s Response: Crockett Park has been improved to include a skatepark and other amenities: two
               youth soccer fields and a dog run. The pavilion received a concrete overlay for sports play and an exercise station
               with five units. Landscaping on the north field will be completed in December with the addition of the City’s 3rd
               Urban Forest with 50+ Native trees� Skatepark was completed November 2021�